KEITH AND MARK IN THE AIR.
|
|
MARK IN THE AIR
|
KEVIN ON THE PETTIBONE. BEAMS FROM GREEN GUY.
|
KEITH ON THE FIRST HOUSE CORNER.
|
THE FIRST BEAM GOES UP ON THE HOUSE.
|
GEORGE PREPARES THE SONOTUBES FOR THE CERAMICS BUILDING.
|
|
|
MIKE BUILT SOME BEAUTIFUL STAIRS UP TO THE FUTURE APARTMENT IN THE BIG HOUSE.
|
THE 2300 LB., 2 FT. X 38 FT. BEAM IS LOWERED INTO PLACE ON THE FIRST DAY OF
SUMMER, 2008.
|
THIS BEAM SPANS THE CERAMICS STUDIO.
|
JUNIOR DELIVERS THE TEX MIX CONCRETE ON JUNE 16TH.
|
ADAM HARD AT WORK CLEANING THE BEAMS
|
ADAM AND CEDRIC ON THE SKY LIFT.
|
CONCRETE INTO THE PIERS FOR THE STUDIO.
|
|
I CAN'T SAY ENOUGH GOOD ABOUT THIS CREW. THEY WORK
HARD, ENJOY THEIR WORK, AND TAKE PRIDE IN THEIR
CRAFTSMANSHIP. THEY BRING GOOD ENERGY TO THE
STRUCTURES.
|
JULY 1, 2008
THE STEEL IS ALL IN PLACE ON THE STUDIO AND WE SAY GOODBYE TO THE CREW WITH
MIXED
FEELINGS. WE'RE GLAD THE STEEL IS IN THE AIR
BUT WE HAVE BECOME FRIENDS WITH THESE MEN AND WE HATE TO SEE THEM GO. I
SUSPECT THEY WILL BE BACK
AS THIS DREAM PROGRESSES.
|
IF YOU NEED A GOOD WELDING CREW, THESE ARE THE MEN TO CALL.
|
EDWARD LOADS BEAMS AT GREEN GUY.
|
THE CREW ON THE LAST DAY. L TO R ISAIAH, AND
KEITH IN FRONT AND TRACY AND MARK BEHIND.
|
|
 MIKE BUILT THIS SET OF
STAIRS ON THE NORTH SIDE OF THE BIG HOUSE. EVENTUALLY THESE STAIRS WILL
LEAD TO A CARETAKER APARTMENT.
|
FLOOR JOISTS IN PLACE FOR UPPER ROOM
AUGUST 12, 2008
|
COMPLETION OF BIG STUDIO FLOOR JOISTS, AUGUST 16
|
1 X 4'S IN PLACE AUGUST 18
|
T and G PLYWOOD IN PLACE AUGUST 20
|
KEVIN, TY, AND BILLY RAY
|
KATE, DANISE, CATHY, BEVERLY, AND VICKI PAINT ON AUGUST 21
|
BEVERLY AND CATHY PAINT THEMSELVES INTO
TINY CORNERS.
|
PAINT DANCE - DANISE, VICKI, CATHERINE, BEVERLY, CATHY, AND KATE
|
BEVERLY AND BOOGER |
AFTER PAINT YOGA RELAXATION - FIRST YOGA IN THE NEW STUDIO AUGUST 21 |
THE FLOOR IS DOWN AND
WE CELEBRATE ON SATURDAY, AUGUST 23, WITH A HOE DOWN.
ON AUGUST 25, WE WILL BEGIN TO
FRAME THE WALLS. |
BIG FLOOR IN PLACE
|
MIKE AND TY WORKING ON THE UPSTAIRS FLOOR
|
UPPER FLOOR CREW
|
|

TWO INCHES OF RAIN JUST AS WE PUT ON THE FINAL COAT OF PAINT
|
PREPARING FOR THE PARTY, TY PUTS UP THE SIGN.
|
PARTY GUESTS.
|
BIG FOOD, BIG FUN AS USUAL.
|
BREAKING IN THE NEW FLOOR.
|
AS SOON AS THE FLOOR WENT
DOWN, WE BEGAN TO FRAME THE STUDIO. MIKE, KEVIN, TY, AND BILLY RAY
BEGAN PUTTING UP THE 2 X 6 WALLS IN LATE AUGUST. |
 |
 |
 |
 |
 |
 |
Monkey Man (a.k.a.) Kevin. He and Ty can put the heat to
it. Here they are attaching a 20' beam that will eventually be the
support for an outdoor balcony off the big upstairs clean room.
|
 |
 |
 |
 |
IF THERE IS
ANYTHING MORE FUN THAN BUILDING SOMETHING NEW, IT'S DEMOLISHING SOMETHING
THAT EXISTS. WE CUT THE CHICKEN SHEDS LOOSE FROM THE GROUND.
WE MOVED THE FIRST SHED EGYPTIAN STYLE, ROLLING IT 30 YARDS ON 4"
PVC. THE OTHER SHED WAS MOVED WITH A SCISSOR LIFT BENEATH IT.
BILLY RAY MAY BE THE ONLY MAN ON EARTH TO DRIVE A CHICKEN SHED ACROSS THE
ROAD. |
 |
 |
 |
| |
|
 |
|